PV Plant Dettmannsdorf
Dettmannsdorf

PV Plant Dettmannsdorf

  • Excavation and backfilling of 12,300 m cable trench
  • 14,200 m HDD directional drilling d 225 / d 200 / d 180
  • 26,500 m laying of MV cable 630 mm², 18/30 kV
  • 7,100 m laying of MV cable 1000 mm², 18/30 kV
  • 26,500 m laying of PE protective pipe 50 x 4.6 mm
  • 26,500 m fiber optic cable blowing, 12 fibers
  • All medium voltage assembly works
  • VLF / Sheath testing / OTDR
ClientEnergiekontor AG
Period01/2025 to 06/2026
110 kV Cable Route Jevenstedt OT Altenkattbek
Jevenstedt

110 kV Cable Route Jevenstedt OT Altenkattbek

  • Excavation and backfilling of 500 m cable trench
  • 4,500 m plowing of 3 x PE protective pipe d 160
  • 12,000 m HDD directional drilling d 160
  • 8,500 m laying of HV cable 1,000 mm² 64/110 kV
  • 11 sets of connection joints 1,000 mm² 64/110 kV
  • 2 sets of outdoor terminations 1,000 mm² 64/110 kV
  • 8,500 m fiber optic cable blowing, 12 fibers
  • High-voltage testing with PD measurement/OTDR
Clientwpd GmbH
Periodsince 03/2026
Wind Farm Ostbevern
Ostbevern

Wind Farm Ostbevern

  • Excavation and backfilling of 4,100 m cable trench
  • 3,200 m HDD directional drilling d 180 + d 50
  • 3,200 m laying of MV cable 150 mm², 18/30 kV
  • 4,000 m laying of MV cable 300 mm², 18/30 kV
  • 7,500 m laying of PE protective pipe 50 x 4.6 mm
  • 7,500 m fiber optic cable blowing, 12 fibers
  • All medium voltage assembly works
  • VLF / Sheath testing / OTDR
ClientGP Joule Anlagenbau GmbH & Co. KG
Period02/2025 to 03/2026
PV Plant Prötzel OT Sternebeck
Prötzel

PV Plant Prötzel OT Sternebeck

  • Excavation and backfilling of 2,600 m cable trench
  • 3,800 m HDD directional drilling d 225 / d 200 / d 160
  • 7,500 m laying of MV cable 240 mm², 18/30 kV
  • 8,800 m laying of MV cable 800 mm², 18/30 kV
  • 15,800 m laying of PE protective pipe 50 x 4.6 mm
  • 15,800 m fiber optic cable blowing, 12 fibers
  • All medium voltage assembly works
  • VLF / Sheath testing / OTDR
ClientTrianel GmbH
Period02/2025 to 08/2025
Grid Expansion Commercial Area Ketzin
Ketzin

Grid Expansion Commercial Area Ketzin

  • Excavation and backfilling of 1,600 m cable trench
  • 7,500 m HDD directional drilling d 180
  • 11,200 m laying of MV cable 240 mm², 12/20 kV
  • 11,200 m laying of PE protective pipe 50 x 4.6 mm
  • All medium voltage assembly works
  • VLF testing
ClientE.DIS Netz GmbH
Period01/2025 to 06/2025
PV Plant Petershagen
Petershagen

PV Plant Petershagen

  • Excavation and backfilling of 12,000 m cable trench
  • 3,000 m HDD directional drilling d 225 / d 200 / d 160
  • 10,000 m laying of MV cable 630 mm², 18/30 kV
  • 17,000 m laying of MV cable 800 mm², 18/30 kV
  • 10,000 m laying of PE protective pipe 50 x 4.6 mm
  • 10,000 m fiber optic cable blowing, 12 fibers
  • All medium voltage assembly works
  • VLF / Sheath testing / OTDR
ClientNaturStromAnlagen GmbH
Period04/2024 to 02/2025