Our References
Successfully realized projects.
From broadband expansion to complex 110kV lines: A selection of our nationwide projects where we have created infrastructure for the future.
100%
Nationwide Reach
200+
Completed Projects
Dettmannsdorf
PV Plant Dettmannsdorf
- Excavation and backfilling of 12,300 m cable trench
- 14,200 m HDD directional drilling d 225 / d 200 / d 180
- 26,500 m laying of MV cable 630 mm², 18/30 kV
- 7,100 m laying of MV cable 1000 mm², 18/30 kV
- 26,500 m laying of PE protective pipe 50 x 4.6 mm
- 26,500 m fiber optic cable blowing, 12 fibers
- All medium voltage assembly works
- VLF / Sheath testing / OTDR
ClientEnergiekontor AG
Period01/2025 to 06/2026
Jevenstedt
110 kV Cable Route Jevenstedt OT Altenkattbek
- Excavation and backfilling of 500 m cable trench
- 4,500 m plowing of 3 x PE protective pipe d 160
- 12,000 m HDD directional drilling d 160
- 8,500 m laying of HV cable 1,000 mm² 64/110 kV
- 11 sets of connection joints 1,000 mm² 64/110 kV
- 2 sets of outdoor terminations 1,000 mm² 64/110 kV
- 8,500 m fiber optic cable blowing, 12 fibers
- High-voltage testing with PD measurement/OTDR
Clientwpd GmbH
Periodsince 03/2026
Ostbevern
Wind Farm Ostbevern
- Excavation and backfilling of 4,100 m cable trench
- 3,200 m HDD directional drilling d 180 + d 50
- 3,200 m laying of MV cable 150 mm², 18/30 kV
- 4,000 m laying of MV cable 300 mm², 18/30 kV
- 7,500 m laying of PE protective pipe 50 x 4.6 mm
- 7,500 m fiber optic cable blowing, 12 fibers
- All medium voltage assembly works
- VLF / Sheath testing / OTDR
ClientGP Joule Anlagenbau GmbH & Co. KG
Period02/2025 to 03/2026
Prötzel
PV Plant Prötzel OT Sternebeck
- Excavation and backfilling of 2,600 m cable trench
- 3,800 m HDD directional drilling d 225 / d 200 / d 160
- 7,500 m laying of MV cable 240 mm², 18/30 kV
- 8,800 m laying of MV cable 800 mm², 18/30 kV
- 15,800 m laying of PE protective pipe 50 x 4.6 mm
- 15,800 m fiber optic cable blowing, 12 fibers
- All medium voltage assembly works
- VLF / Sheath testing / OTDR
ClientTrianel GmbH
Period02/2025 to 08/2025
Ketzin
Grid Expansion Commercial Area Ketzin
- Excavation and backfilling of 1,600 m cable trench
- 7,500 m HDD directional drilling d 180
- 11,200 m laying of MV cable 240 mm², 12/20 kV
- 11,200 m laying of PE protective pipe 50 x 4.6 mm
- All medium voltage assembly works
- VLF testing
ClientE.DIS Netz GmbH
Period01/2025 to 06/2025

Petershagen
PV Plant Petershagen
- Excavation and backfilling of 12,000 m cable trench
- 3,000 m HDD directional drilling d 225 / d 200 / d 160
- 10,000 m laying of MV cable 630 mm², 18/30 kV
- 17,000 m laying of MV cable 800 mm², 18/30 kV
- 10,000 m laying of PE protective pipe 50 x 4.6 mm
- 10,000 m fiber optic cable blowing, 12 fibers
- All medium voltage assembly works
- VLF / Sheath testing / OTDR
ClientNaturStromAnlagen GmbH
Period04/2024 to 02/2025